There were two new crews on-site by the time I arrived today. Concrete Pete for the slabs and Pacific Gunite for the catchment.
Apparently as the concrete truck was backing in for the catchment pour - a Manila Palm jumped in its way... though the crew yelled for the truck to stop, it was to no avail.
It's one less to move in the future (if there is a bright side).
The Victim
The Accused
Same vantage point as previous panoramas
This is from standing on the house-pad - almost a 360 view
Electrical - and Plumbing from the garage - where the inverters and water pump will be located into the house.
Catchment base - hopefully the catchment will be completed by Friday.
A snag on the electrical permit - but it was an easy fix (water lines were not proper spacing from electrical, all it took was for someone to push them farther away.)
Another inspection happens and they will treat the garage area base for termites and then the slab should be poured, hopefully by Monday.
Framing of the garage could start next week.