Work is in full swing now

Plumbers - Electricians - and the final touches to excavation.
The excavators took the big equipment today and will return after the pool is complete to "backfill" the area.




The youngest excavator - 6 years old.



Double time!



House pad is raised 4 feet.  Originally was planned for 5 feet.


We had to surface the entry road - heavy equipment doesn't like mud.


From the area outside the lanai by the guest rooms - looking over the pool.


Plumbing and Electrical trenched - inspection set for tomorrow - Nov 3.


This is the ocean path - newly sculpted - much easier to get to the tidepool (the path is on the right side of the picture - house site is to my left.)


New garden - fruit trees moved to both sides of this path.  We had cinder and cinder soil placed in the new areas.  Hydro-mulching is set for Saturday.


The rest of the area that will be hydro-mulched.  Kukui and Plumeria on the left - Red Road farther left and bamboo on the right.  Just want this as a grassy area for future use.


They took the big equipment away - and I never got to test drive them!


This is from HPP - moonset over Mauna Kea on November 3rd.  (Sorry about the power lines)