The excavators took the big equipment today and will return after the pool is complete to "backfill" the area.
The youngest excavator - 6 years old.
Double time!
House pad is raised 4 feet. Originally was planned for 5 feet.
We had to surface the entry road - heavy equipment doesn't like mud.
From the area outside the lanai by the guest rooms - looking over the pool.
Plumbing and Electrical trenched - inspection set for tomorrow - Nov 3.
This is the ocean path - newly sculpted - much easier to get to the tidepool (the path is on the right side of the picture - house site is to my left.)
New garden - fruit trees moved to both sides of this path. We had cinder and cinder soil placed in the new areas. Hydro-mulching is set for Saturday.
The rest of the area that will be hydro-mulched. Kukui and Plumeria on the left - Red Road farther left and bamboo on the right. Just want this as a grassy area for future use.
They took the big equipment away - and I never got to test drive them!
This is from HPP - moonset over Mauna Kea on November 3rd. (Sorry about the power lines)